What should be done to prevent water accumulation in a construction trench?

Prepare for the NICET Highway Construction Inspector Level III Exam with interactive questions and detailed explanations. Master construction standards and techniques to boost your career!

To effectively prevent water accumulation in a construction trench, installing proper drainage systems is essential. This method allows for the systematic removal of water that may enter the trench due to rain, groundwater, or other sources. Drainage systems can include components like trenches, pumps, and perforated pipes designed to redirect water away from the work area, maintaining a safe and dry environment for construction activities. This not only aids in ensuring the stability of the trench but also mitigates potential hazards related to water accumulation, such as soil erosion and unsafe working conditions.

In contrast, covering the trench with a tarp may provide temporary relief but is generally not effective for drainage and can lead to water being trapped. Filling the trench with concrete is not practical as it negates the purpose of the trench and can create significant complications. Leaving the trench open to air does not prevent water accumulation and can be risky, especially during inclement weather. Thus, the establishment of a proper drainage system remains the most effective approach.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy